The most recent photos are listed first. See also photomap view.
This listing only shows photos within a square radius of 30 kilometres of the centre of Assen.
Go to the national CycleStreets photo listings for photos beyond.
Story of a teenage girl who fell off a bike awkwardly causing an injury that ultimately led to her death. After initially being treated as a minor injury the condition deteriorated during the night and eventually they were told she … [more]
The road from the A30 to Zelah has been closed to motor traffic and made cycles-only (NCN32) during the A30 dialling works. The cycle light changes at the same time as the main light so is a bit pointless.
[Image taken 9.7.23] Scarborough Bridge, York. [NOTE: No street view at this location.] Crowds watching the dragon boat racing taking place on the Ouse below. Other image here today and links: #195926.
[UPDATE: 27.6.23 See: #195389.] [Image taken 24.6.23] Nr Cocoa Gardens entrance, Wigginton Road, York. Context: #195259. A fast response from CYC. However the subsidence had worsened since my reporting the problems and the area being … [more]
[Image taken 9.5.23] Foss Islands Path, York. [Note: No street view at this location.] The limited cutting has not solved the problem of there being no sight lines here. Context: #193852. Other image here today: #193869.
[Newer image: 13.7.23: #195914.] [Image taken 9.5.23] Foss Islands Path, York. [Note: No street view at this location.] Context: #193853. Other image here today: #193870.
Excessive hi viz and lights but why aren’t they working asks Jeremy Vine: https://twitter.com/thejeremyvine/status/1640415122966323201?s=46&t=e9UMi9e1awWS8DPtaVyqlQ
https://t.co/yMunHeR4AU [Image showing new kerb-protected cycleway under construction at the Clyde Street/Glasgow Bridge junction.]
[Image taken 23.1.23] Foss Islands Path (Denning’s Yard/Crichton Ave end), York. [NOTE: No street view at this location.] Image taken after the sides of the path have been cleared to show how much more room there is, how much lighter it is, … [more]
Chisholm Trail - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Chisholm Trail - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Chisholm Trail - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Chisholm Trail - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Chisholm Trail - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Chisholm Trail - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Chisholm Trail - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Chisholm Trail bridge - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Chisholm Trail bridge - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Chisholm Trail - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Chisholm Trail - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Coldham's Common - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Coldham's Common - two days after the snow fall. There's an icy crust covering most of the path with a thin track clear for cycling.
Tractor blowing leaves into the ditch at an edge of Jesus Green: https://twitter.com/cambsclimate/status/1600495639921655808?s=46&t=k6TmqTA7toZnHW9Kzf2A1A
Evelyn St Deptford. Cycleway 4. Video of cycleway at: https://twitter.com/n00dles71/status/1600432265925840896?s=46&t=cs8Mf_SD_ixCOTgVATZ7TA
The St Andrews Drive cycleway is physically rideable, but awaits completion of traffic signal works.
Dropped kerb ahead where the building works finally close the cycleway and cyclists have to move to the shared-use area.
Sydney Harbour Bridge steps, morning of the Gong ride. This is why we need a bridge ramp without any further delay. After over 40 yrs campaigning, we’re really pleased with the current design 👉 https://t.co/mqaodpB2eR and look forward to … [more]
Rather than cleaning the moss and lichen that has grown on the outside of the Carter Bridge it's cheaper to hide it by painting the insde.
Twitter video of hat-trick of hurdles on cycle way. https://twitter.com/mad_1nventor/status/1552768277465669635?s=21&t=Hr8JsqjiC6gaXXyk_Qzvfg
A year ago I went to see the residents of Harebell Close in #Peterborough about putting in some kissing gates where the cycle path meets the road 👍 This is about safety. Officers agreed with me and promised action. We have e messed around … [more]
What a difference a protected #cyclepath makes - we love our #wands! Now everyone can #cycle safely #WarnefordLane #EastOxford #activetravel https://t.co/odzoTWc6ir
Come on @RBKC - you are a huge gap in London’s safer cycle network. We can still see the shadow lines and bolt holes on Ken High St where the bike lane used to be. Let’s work together to put in a safe route before anyone else gets hurt. … [more]
Flagship cycle lane. Notice cyclist on the road to avoid the river. @MadCycleLaneMCR @ManCityCouncil https://t.co/JWtZWvOnX8
A detector has been installed in the Bunhouse Road cycleway, but is so close to the traffic signal users will have almost stopped before being detected.
Tandem puncture almost at the meridian on the busway near Swavesey. See #182506 for a short clip of the air leaking out!
Construction of the rebuilt modal filter at North Woodside Road is nearly complete. The road and pedestrian traffic signals have been brought into use, but the cycle signals are still bagged up.
Tweet of video of a motor vehicle blocking the cycle lane, rider struggles to get past as lorry passes on the road. https://twitter.com/Petercl04558275/status/1514642938017587204?s=20&t=jSAY_WEEZBPDZbM56oYSRQ
[UPDATE: #180733] [Image taken 24.3.22] Haxby Cycleway, New Earswick, Huntington/Haxby/York. [Note: No street view at this location.] Context: #180362. Both racks removed again. One visibly discarded. Where’s the other? Who is taking them … [more]
A section of the Cambridge busway is set to close next week due to safety concerns. I’ve come to check out what it’s all about. Read all about it in next Tuesday’s blog. https://t.co/SdaRu2K4Rt
We were under the impression that guided buses weren't running on the northbound track pending a safety review - at least this one was moving pretty slowly. [It seems that, rather than immediate closure as you might expect, it was due to … [more]
Jim Chisholm showing friends the new bridge on 'his' trail. [The wooden railings are temporary, it seems - www.cambridgeindependent.co.uk/news/temporary-safety-rail-on-the-7m-abbey-chesterton-bridge-ch-9236442 ]
The Benalder Street/Argyle Street crossing still awaits commissioning, and signage for former car parking spaces awaits removal. New works have started on the Snow Bridge across the junction, making access trickier.
[Image taken 17.11.21] Monks Cross retail park, Monks Cross, Huntington, York. [NOTE: streetview shows the previous site layout.] You could be forgiven that these items had not yet been invented when you visit by cycle so often is the … [more]
The temporary segregation at the south end of Kelvin Way has temporarily been removed for COP26, and although the fences have now been removed from around the Kelvingrove Art Gallery, the segregation has not yet been replaced. The 'Road … [more]
Route 62 getting resurfaced. Location: Worsbrough Bridge, Barnsley (England, UK) This work will complete later in November 2021.
Link to video in which a bus cuts in front of cyclist Jeremy Vine as it comes to a stop: https://twitter.com/thejeremyvine/status/1455863859273687040
This footway is significantly busier than when the area to the left was a scrapyard and not student accommodation. But the COP26 diversion route has been signed over this regardless.
Narrow redesignated footway on expressway sliproad, with added fencing. When the fencing was installed, it blocked a dropped kerb at the toucan crossing ahead, but this had been resolved by the time I was there.
#CamRideHome at the redeveloped Robin Hood junction discussing the changes. Overall conclusion: a slight improvement for cycling over what was there previously. Main improvement is the High Street approach has been reduced to one lane.
Car driven along Blackweir cycleway https://www.bbc.co.uk/news/uk-wales-58662042 Also page about cycling in Cardiff: https://en.m.wikipedia.org/wiki/Cycling_in_Cardiff
Still no raised crossing or dropped kerb to join the Benalder Street cycle track, which otherwise appears nearly complete, apart from the lamppost. UPDATE: These issues have now been resolved, see #175144.
The Benalder Street cycle track ends at the Castle Street junction. It is not obvious what is to happen here.
The pop-up two-way cycle lane on Royston Road. approaching the Broomfield Road junction. The cycle signals are on green during both general traffic phases, so any turns from the cycleway are not protected.
The pop-up two-way cycle lane on Royston Road approaching the Broomfield Road junction. Note that the cycle traffic signals are green at the same time as traffic is exiting Broomfield Road. The cycle lights were green during both general … [more]