You may also be interested in the automatic categorisation listings and themed galleries.
This listing only shows photos within a square radius of 30 kilometres of the centre of Assen.
Go to the national CycleStreets photo listings for photos beyond.
The Rutland Cycles shop at Cambridge station has closed - but don't worry, they say, you can go to another branch that's a pain to reach except by car.
Stands gradually being removed as they become loose, due to being wrongly installed in the first place
The type of picture that might appear in the local newspaper when reporting on an infrastructure tour of Cambridge.
Cambridge CyclePoint - a visit on an infrastructure tour. The main problem of this cycle park is no-one wants to pay to maintain it properly. Hence it is dirty, littered with broken racks and has a high rate of cycle theft.
One of the bikes I turned upside down in September last year is still there at the end of March, see #102763
These two upside down bikes are still there just on the left at the top of the ramps after at least 29 days - see #102763.
See #102763. The bikes do now have tags that were added on the 15th saying they're going to be removed on the 31st.
Plans afoot to remove abandoned bikes like those at #102763. https://www.greateranglia.co.uk/cycling
CyclePoint I turned these bikes upside down about a month ago (September 2018) because I'd noticed they'd been missing a wheel on a few previous visits. They're still there! But there are plans to clean them out according to signs that are … [more]
Plenty of space at the Cyclepoint at Leeds station - currently only open to monthly/annual users with a swipe card, presumably due to staff cuts.
The Cyclepoint at Leeds station - currently only open to monthly/annual users with a swipe card, presumably due to staff cuts.
The Cyclepoint at Leeds station - currently only open to monthly/annual users with a swipe card, presumably due to staff cuts.
CyclePoint Cambridge, first floor parking area almost full mid-afternoon on Wednesday 2nd March 2016
Martin speaking to @itvanglia about our joy at the new #Cambridge #Cyclepoint parking after 20 years of campaigning.
We walked at easy pace from far end to station entrance in 1:52. Via new exit with artwork. #cyclepoint https://t.co/yys0fJ6Xwp See #74172
View from first floor of Cambridge CyclePoint at the top of the ramps and steps. Video: https://youtu.be/HT9vJV6_-yw
Steps link the first floor of the CyclePoint car park with Cambridge railway station forecourt. The mobile projects onto the ceiling see #74185.
Showing the security bolts that have been used to mount the anchor points to the double decker racks.
On the first floor of the cycle park - eerily empty of bikes as it has only been open for a few hours. Tomoz I expect it will be brimming with bikes.