You may also be interested in the automatic categorisation listings and themed galleries.
This listing only shows photos within a square radius of 30 kilometres of the centre of Assen.
Go to the national CycleStreets photo listings for photos beyond.
[Image taken 22.11.23] St Andrewgate, York. More substantial bollards – anti terror measures - uniformly spaced (compare with: #198368) across the full width of the street. Context: #198375. Other images today: #199402, #199403.
With just a few weeks to go until the start of COP28, bollards removed for a COP26 event are just being replaced outside the Kelvingrove Art Gallery.
The cycle connection between Yorkhill Street and Overnewton Street now useable again, but still not signed to indicate the Traffic Regulation Order allows cycling through the otherwise closed to vehicular traffic section of road.
[Image taken 10.10.23] Spen Lane, York. Looking in the direction of Spen Lane. [NOTE: No street view at this exact location.] No width limitation at this end… No obstruction this end. Context and links: #198377.
[Image taken 10.10.23] Saint Andrew's Evangelical Church, York. Looking in the direction of Spen Lane. [NOTE: No street view at this exact location.] Context and links: #198377.
[Image taken 10.10.23] Saint Andrew's Evangelical Church, York. Looking in the direction of St Andrewgate. [NOTE: No street view at this exact location.] Context and links: #198377.
[Image taken 10.10.23] St Andrewgate, York. The bollards obstruct a cut-through passing Saint Andrew's Evangelical Church (www.standrewschurchyork.org.uk/). The bollards are barriers – to most users. I would not be able to push my cycle … [more]
[UPDATE Image from 22.11.23 showing the antiterror barricades/bollards positioned the full width of the street see: #199401.] [Image taken10.10.23] St Andrewgate, York. Why have these anti terror/oversized bollards been put here? They … [more]
[Image taken 10.10.23] St Andrewgate, York. Contrast the spacing between these bollards and these: #198368. Other images here today: #198372, #198373, #198374.
[UPDATE These bollards have been removed. See: #199401.] [Image taken 10.10.23] St Andrewgate, York. In October 2023, these bollards were removed. And reinstated. In the same place. Despite the gaps not meeting standards (150cm). I can’t … [more]
[Image taken 7.10.23] Reid Park, Haxby. [NOTE: No street view at this exact location.] The person in the kissing gate has had to turn his front wheel tightly – risk of jack knifing – but also to lift his cycle to reposition it to be able to … [more]
[Image taken 7.10.23] Reid Park, Haxby. The bollards are too close together. They would not meet the LTN120 standard (https://assets.publishing.service.gov.uk/media/5ffa1f96d3bf7f65d9e35825/cycle-infrastructure-design-ltn-1-20.pdf) of a … [more]
[Image taken 20.9.23] Aldwark junction with St Andrewgate, York. A City of York Council taxi driver is obstructing the filtered permeability. He is also completely blocking the sight lines for people emerging from the other side of the … [more]
[Image taken 12.9.23] Lidl, James Street, York. Two trailers. Only one of which is causing an obstruction. Other image today and links: #197443.
[Image taken 20.8.23] Skeldergate, York. Looking southbound towards the northernmost set of two chicanes installed in August 2023. The motorist adjusted the position of his/her vehicle when s/he saw the oncoming vehicle was a bus. S/he … [more]
[Image taken 20.8.23] Skeldergate, York. Looking northbound through the cycle channel of the northernmost set of two chicanes installed in August 2023. If a cyclist uses the channel s/he is taking themselves out of the assertive road … [more]
[Image taken 20.8.23] Skeldergate, York. Looking northbound through the northernmost set of two chicanes installed in August 2023. This 'all vehicles' lane is very tight for buses. But does it slow motor traffic speeds? Other image this … [more]
[Image taken 20.8.23] Skeldergate, York. Looking northbound at the northernmost set of two chicanes installed in August 2023. Two cyclists show how I think many/most people on cycles will use this layout or they will not change their line … [more]
[Image taken 20.8.23] Skeldergate, York. Looking northbound at the northernmost set of two chicanes installed in August 2023. The arrows show the desire lines for people cycling. And, therefore, the trajectory they will take (see: #196886). … [more]
[Image taken 20.8.23] Skeldergate, York. Looking northbound at the northernmost set of two chicanes installed in August 2023. For cyclists to follow the curve of the road and align themselves with the cycle channel is a real dog leg. You … [more]
[Image taken 20.8.23] Skeldergate, York. Looking northbound at the northernmost set of two chicanes installed in August 2023. People on cycles are presumably supposed to keep left and bypass the give way markings. This layout is not … [more]
[Image taken 20.8.23] Skeldergate, York. Looking northbound towards the northernmost set of two chicanes installed in August 2023. Notice there is a dog leg to the left of the give way markings. It follows the shape of the road. This is … [more]
[Image taken 20.8.23] Skeldergate, York. Looking southbound. This is the northernmost of the two sets of chicanes installed August 2023. Note the dropped kerbs either side of the raised table. There is no protection for people crossing … [more]
[Image taken 20.8.23] Skeldergate, York. Looking southbound towards the northernmost of the two sets of chicanes installed August 2023. Other images of the new layout in Skeldergate today: #196881, #196882, #196883, #196884, #196885, … [more]
Bollards recently added here - presumably to prevent the grassy area from being driven upon? Or perhaps (shudder) from being cycled upon... #108204 ?
The Shore Circular Path at Clydeview. The path starts off reasonably wide, gets narrow, then returns to being wide again.
[Image taken 5.7.23] Butcher Terrace (direction of the Millennium Bridge), York. The newish dropped kerb: more information see: #169825. Tom, the person in the image, works in forestry (https://workingwallsandwoods.co.uk/about/). He told me … [more]
[Image taken 4.7.23] Denning's Yard Access (between Crichton Avenue and the Foss Islands Path), York. The fence has been mended (see: #195702) but that wasn't a problem. In fact, I considered it a benefit. The thing that needed doing was … [more]
[Image taken 4.7.23] Denning's Yard Access (between Crichton Avenue and the Foss Islands Path), York. I saw today the fence has been repaired. This is disappointing! When coming uphill (towards the camera) the wider gap between the bollard … [more]
[CYC reply: 1.8.23 "Having spoken with the relevant engineer the bollards are fit for purpose and will be staying in their current locations."] [Image taken 19.6.23] The Stonebow, York. A large area of tactile paving, a wide dropped kerb, … [more]
To the person who went to all the trouble to put carpet grippers between the bollards on Goldsmith Row Hackney go f*ck yourself. Removed, despatched https://t.co/pyxogjouY6
[UPDATE: 4.7.23 Fence repaired: #195702.] [Image taken 6.6.23] Denning's Yard Access (between Crichton Avenue and the Foss Islands Path), York. A couple of days ago I noticed the fence was broken. Has it been hit by a motor vehicle? I saw a … [more]
The Levern Walkway at Carlibar Road, at park entrance, and the nearest dropped kerb for cycling from the road.
Signs at the Jane Coston Bridge state: Route 11 is interrupted between Lode, Wicken and Ely, follow Route 51 to Bottisham. For NCN route 11 to Lode, Wicken and Ely, follow Route 51 to Bottisham.
[Image taken 14.5.23] Link route between New Lane and the Park & Ride at the LNER Community Stadium, York. [NOTE: No street view at this location] This family was on its way to visit grandparents and have a picnic with them. The existence … [more]
[Image taken 14.5.23] Link route between New Lane and the Park & Ride at the LNER Community Stadium, York. [NOTE: No street view at this location] New bollards have been installed. They may have met the minimum standard of the 150cm gap … [more]
Whoever closed Queen Charlton Lane to traffic…. Thank you! It’s bloody glorious. https://t.co/VtNY3BqRQh Bollard at: https://www.openstreetmap.org/node/371847#map=19/51.40068/-2.54573 … [more]
The path from the new bridge across the Black Cart Water continues for a short distance on this side of the A8 before crossing to the other side where it continues all the way to the edge of Bishopton.
The path from Abbotsinch Road to Inchinnan Road at the bascule bridge. The cycleway effectively ends at the bridge and it's onto the road for Renfrew and Glasgow, although a riverside path route starts on the other side of the river that … [more]
Bollards protection https://twitter.com/streetfilms/status/1300081099129982977?s=46&t=e9UMi9e1awWS8DPtaVyqlQ https://twitter.com/worldbollard/status/1643254909008003072?s=46&t=e9UMi9e1awWS8DPtaVyqlQ
[Image taken 3.4.23] Entrance to Rowntree Park, from car park off Terry Avenue, York. The map of the city is good practice. Helps you orientate and to discover what else you can do. For example that you can walk/ride along the Ouse to the … [more]
Discriminatory blocking of the route to the Arkleston bridge across the M8 motorway, with tyres being placed over the bollards, narrowing the gaps between them considerably.
The start of the unsigned diversion route for the canal towpath closure still has signs up for the Stockingfield diversion.
[Image taken 17.3.23] Denning’s Yard access, York. The crossing is around 3m 80cm wide. Context and links: #192126.
[Image taken 11.3.23] Vyner Street junction with Newby Terrace, looking towards Wigginton Road, York. The damaged tarmac has been repaired. Context: #191151. As this image shows, the patching is in the direct line of someone cycling from … [more]
The Provan Hall Trail at the far end of Blairtummock Park. From here the trail is signed along Easterhouse Road to Easterhouse Railway Station. The path ends at the motorway sliproad junction. The road ahead, Rogerfield Road, looks even … [more]
[UPDATE: An email from CYC on 23.2.23 says: Thank you for your Road and Pavement problems report... The current status of your report is: closed. The problem has been inspected and no follow up work is required.] [Image taken 18.2.23] Newby … [more]
[UPDATE: 7.3.23 An email from CYC today says: Thank you for your Road and Pavement problems report... The current status of your report is: closed as repaired. See: #191952] [UPDATE: Email from CYC 23.2.23 Thank you for your Road and … [more]
[Image taken 16.2.23] Lidl, James Street, York. [NOTE: No street view at this location] The cycle parking at Lidl is accessible – because there are no parking spaces in front of it. (Compare with the situation at Aldi on Water Lane: … [more]
[Image taken 11.2.23] Micklegate, York. The buildouts with the Sheffield racks look like a sop... They facilitate car parking. What if the arrangement were reversed? Two spaces off-road for motor vehicles and all the onstreet spaces for … [more]
[Image taken 11.2.23] Micklegate, York. The six Sheffields (see: #177267) have been reduced to four. So four fewer spaces to secure a cycle. Yet Micklegate needs more formal racks not fewer. Other image this subject today: #190980. Other … [more]
The bollards removed for COP26 still have not been reinstated, and the plastic box keeps getting moved aside, allowing drivers to enter and leave the Kelvingrove Art Gallery grounds from Argyle Street, at the pedestrian crossing (see … [more]