Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | cambridge, romsey, twowaycycling2018 |
Date time: | 6.35pm, Wednesday 18th April, 2018 |
Time line: | Earlier | Later |
Facing: | Bearing of 210° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Canvassing by local councillors on the day that contraflow cycling signage has gone up.
twitter.com/simon_nuttall/status/986662533217079297
Comments reflect the views of the original submitter only.