Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bridge, cyclists, dismount, dragon, green, twitterimport |
Date time: | 1.15pm, Saturday 15th July, 2017 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | radwagon |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/RadWagon/status/886646951810289664 |
Credit: | Rad Wagon [Twitter username: 'RadWagon'] |
Area: | Cambridge |
Confusing #Cyclists #Dismount signs have finally gone from the north side of #GreenDragon bridge. t.co/wXZ59x4Hrh t.co/w0Q4tcTZLR
Comments reflect the views of the original submitter only.