Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cut-through, double-yellow |
Date time: | 3.34pm, Thursday 30th October, 2003 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Cut through to Beehive centre
Comments reflect the views of the original submitter only.