Add to Gallery: | Add this photo to a Gallery |
Category: | Any old sign: Other (infrastructure-related) |
Tags: | cam, ditton, fen, river |
Date time: | 2.01pm, Tuesday 30th August, 2016 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | amassie |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | A Massie |
Green End is a dead end.
It SHOULD be a meeting of ways.
1. The Byway meets Horningsea Road at the point where the cycle track becomes far too narrow.
2. The footpath to Baits Bite Lock could connect to the towpath on the other side and so to Milton and Waterbeach with a suitable path and bridge.
All need developing.
Comments reflect the views of the original submitter only.