Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Other (infrastructure-related) |
Tags: | tins, twitterimport |
Date time: | 4.04pm, Wednesday 14th October, 2015 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | simon |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/camlakes/status/654311936583143425 |
Credit: | camlakes [Twitter username: 'camlakes'] |
Area: | Cambridge |
The cycle path along the back of the lakes is closed for 2 months for widening. Hope they do a good job. t.co/YpaKbRwaQs
Comments reflect the views of the original submitter only.