Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Other (infrastructure-related) |
Tags: | a898, erskinebridge, fencing, railings, rainbow |
Date time: | 3.06pm, Sunday 4th March, 2012 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
New anti-climb fencing being installed on Erskine Bridge. Cycle track on opposite side has become two-way temporarily while work is being undertaken.
Comments reflect the views of the original submitter only.