Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | path, tins |
Date time: | 6.14pm, Saturday 9th April, 2011 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | soundandfury |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
This shows the extension to the bend after the railway bridge towards Cherry Hinton on the Tins path
Comments reflect the views of the original submitter only.