Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | 40mph, a8renfrew, cyclelane, dualprovision, end, footway, mcl, paint, roundabout, shareduse, slip |
Date time: | 3.00pm, Sunday 4th June, 2023 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
The dual provision of Barrangary Road ends at the Barrangary Roundabout, with the on-road cycle lane feeding into the shared footway.
Comments reflect the views of the original submitter only.