Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | buslane, contraflow, crossing, cycleway, scw, sign, slow, zebra |
Date time: | 2.52pm, Wednesday 17th May, 2023 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The South City Way cycleway finally complete past the Sheriff Court. However, the contraflow bus lane signs along this section are now out of date and need replaced.
Comments reflect the views of the original submitter only.