Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | bridge, crossing, footway, junction, new, shareduse, sign, toucan, trafficsignals |
Date time: | 11.17am, Sunday 2nd April, 2023 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
Shared footway leading to new bridge across the Black Cart Water.
Comments reflect the views of the original submitter only.