Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | crossing, ncn756, scw, segregation, toucan, twoway, underconstruction |
Date time: | 12.13pm, Sunday 4th September, 2022 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Work continues on the Gorbals Street cycleway, which will form part of the South City Way. This is the toucan crossing where NCN756, the South Bank cycle route, crosses.
Comments reflect the views of the original submitter only.