Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | corduroy, incorrect, northcanalbankstreet, paving, tactiles, through, traffic |
Date time: | 12.51pm, Thursday 16th June, 2022 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
North Canal Bank Street back open to traffic, and there's plenty of it.
The tactile paving on the cycle track is still incorrect.
Comments reflect the views of the original submitter only.