Add to Gallery: | Add this photo to a Gallery |
Category: | Any old sign: A problem that needs to be fixed |
Tags: | cambridge, cambridgenorth |
Date time: | 11.11am, Thursday 13th January, 2022 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
A lot of effort has gone into signing a diversion - but both cycleways north from Cambridge North are perfectly useable at the moment.
Comments reflect the views of the original submitter only.