Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | crossing, glasgow-cumbernauld, junction, sighthill, toucan, trafficsignals, underconstruction |
Date time: | 8.00pm, Sunday 1st August, 2021 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Sighthill regeneration continues. From the width of this path, and the toucan crossings at the junction, it appears it may be a shared-use path in place of the Glasgow to Cumbernauld cycle route path that used to be here.
Comments reflect the views of the original submitter only.