Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | harston |
Date time: | 9.10am, Saturday 22nd May, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
The shared-use path is still too narrow, but a crossing has now been installed.
Comments reflect the views of the original submitter only.