Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | bootham, ouse, pothole, railings, railstation, removal, royalmail, scarboroughbridge, sightlines, tarmacdamage, york |
Date time: | 6.00pm, Sunday 21st March, 2021 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 21.3.21] Nr Royal Mail sorting office, Leeman Road/Esplanade, York. NOTE: No streetview at this location. Improved sightlines from/to the ped-cycle routes at the Ouse on the corner of the Royal Mail building. The Mapillary link tinyurl.com/pnpb9ze9 showed the issue pre-March 2021. The railings have now been taken back behind the tree. In the cyclestreets image, the steps and the route passing in front of the bottom of them lead to Scarborough bridge. The rail station is around 50m to the left at bridge level and the Bootham side of town over the bridge to the right. See also: #165863, #165864 [NOTE: The damage visible in this image was still unrepaired on 19.4.23 see: #193158]
Comments reflect the views of the original submitter only.