Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Event or temporary issue |
Tags: | None |
Date time: | 4.11pm, Wednesday 5th December, 2007 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Simon Nuttall |
Area: | Cambridge |
Preparing to 'pull' the main span onto the support pillar.
Riverside Bridge.
Comments reflect the views of the original submitter only.