Add to Gallery: | Add this photo to a Gallery |
Category: | Any old sign: Event or temporary issue |
Tags: | construction, cowleyroad, signs |
Date time: | 3.27pm, Saturday 28th December, 2019 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | mdanish |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
It's December 28th. Seems like they've scheduled a whole lot of work for December 30th-31st!
Comments reflect the views of the original submitter only.