Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | (regional), bridge, bridgewater, road, route, seamins, way |
Date time: | 7.19am, Friday 21st June, 2019 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | bobsweet |
Copyright: | Public domain |
Download: | View full-size original |
Credit: | bob sweet |
Area: | Salford |
This is where the surfaced section ends. You can turn and go beside the wood or through the wood onto the transPennine trail.
Comments reflect the views of the original submitter only.