Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | double-yellow, ncn67, railings |
Date time: | 2.24pm, Monday 7th January, 2019 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | castlecycles |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Credit: | malcolm@castlecycles.co.uk |
Area: | Chesterfield |
northbound cycle lane looking south to show narrow lane round band with railings and pavement below road level. With the construction taking place why not take to opportunity to move everything over and make this safer?
Comments reflect the views of the original submitter only.