Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 8.40am, Tuesday 30th January, 2007 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | unnameduser124 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Stefan Kaye |
The path beside the A428 at the junction with the new alignment of Broadway (the road to Bourn). Work on this path has now been completed (6 July 2007).
Comments reflect the views of the original submitter only.